What if unclear labeling leads to installation chaos during a hotel's opening with a tight schedule?
- Share
- Issue Time
- May 7,2026
We use "Sequence-Driven Labeling" (precise labeling based on construction logic). During the quotation, packaging, and box marking stages, we record the corresponding "Room No." and "Floor" for each product, transforming it into a "Function Area." Upon shipment, the corresponding functional area will be clearly marked on the outside of the packaging box. This can save your contractor over 30% of sorting and installation time.